I spent many hours looking at all of the builds on the forum and decided to dip my toes into the build pool. I wanted to start off basic and cheap, knowing that down the road I will take it 5 steps beyond. This project involved $20 in wood (8-2x4 studs), $20 in paint (primer and flat black exterior paint), $10 in casters, and scrap plywood I had left over from remodel projects. I left the studs on the top tier tall in cast I wanted to put some type of guard for my pot, but I don't think I'll need to. I have high temp paint for spots near the flame, but it hasn't been necessary so far. Now I need to add a 5th tap to the kegerator.