[SQ1]R3 30A Lowish Cost E-BIAB Controller Build

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Mirilis

Lvl 10 Beer Nerd
HBT Supporter
Joined
Feb 15, 2008
Messages
1,876
Reaction score
164
Location
Chicagoland
So I got done modelling my controller and settled on a method of control that I like based on the way that I like to brew. I thought I would share this to see what you guys think. My Target was for it to cost me less than $100 to build. (some of the pieces I have already)

I started assembling some of it today and should be done in the next 2 weeks or so.

If there is interest i can do a more elaborate write up of it if it will help

I have made one change.. i was able to salvage some L6-30 connectors from a server tower so I will be putting a L6-30R receptacle in the panel instead of the 3 wire dryer receptacle i modeled

unnamed-1-67577.png


unnamed-2-67578.png


unnamed-3-67579.png


unnamed-4-67580.png
 
Got all my parts. Started installed the heat sink/SSVR and got my face panel cut. I kinda of didnt pay attention to the dremel chuck when i cut the square.. so now i have that to fix.

img_2376-67591.jpg
[/IMG]

img_2377-67592.jpg
 

Latest posts

Back
Top