So I got done modelling my controller and settled on a method of control that I like based on the way that I like to brew. I thought I would share this to see what you guys think. My Target was for it to cost me less than $100 to build. (some of the pieces I have already)
I started assembling some of it today and should be done in the next 2 weeks or so.
If there is interest i can do a more elaborate write up of it if it will help
I have made one change.. i was able to salvage some L6-30 connectors from a server tower so I will be putting a L6-30R receptacle in the panel instead of the 3 wire dryer receptacle i modeled
I started assembling some of it today and should be done in the next 2 weeks or so.
If there is interest i can do a more elaborate write up of it if it will help
I have made one change.. i was able to salvage some L6-30 connectors from a server tower so I will be putting a L6-30R receptacle in the panel instead of the 3 wire dryer receptacle i modeled