I’m in the process of outfitting a brewtroller electric brewery. I have looked at the various configurations and designs. It seems like folks are either down 2 elements or 4 elements (commercial settings). I currently have a Brutus 10 propane setup and I direct fire my mash tun.
Originally I was thinking I would have an element in the boil kettle, and element in the HLT, and a RIMS tube for the mash recirc.
This would put me at an 80amp system I believe. I want to have the ability to run two separate batches simultaneously step wise.
Am I doing overkill here? I suppose in theory that I can still run it step wise with a HERMs system and two elements.
Originally I was thinking I would have an element in the boil kettle, and element in the HLT, and a RIMS tube for the mash recirc.
This would put me at an 80amp system I believe. I want to have the ability to run two separate batches simultaneously step wise.
Am I doing overkill here? I suppose in theory that I can still run it step wise with a HERMs system and two elements.