MrSpooky
Active Member
- Joined
- Mar 1, 2013
- Messages
- 40
- Reaction score
- 3
Heres a single tier that Iv been working on. The gass plumbing isnt done yet, but almost. I plan on puting wood on the sides like I did on the front.
From left to right will be my HLT, MT, and BK. On the left side (where the wood isnt on yet, I plan on mounting a water filter so I can go streight up to the HLT. On the right side (where ther wood isnt on yet), I plan on mounting a GFI power box to plug a pump/ pumps into. On the frount (under the BK) Im gonna mount a water chiller. Does it seem like my plans are in order, or are there any sudgestions on the way my configuration might work better?
thanks
spooky
From left to right will be my HLT, MT, and BK. On the left side (where the wood isnt on yet, I plan on mounting a water filter so I can go streight up to the HLT. On the right side (where ther wood isnt on yet), I plan on mounting a GFI power box to plug a pump/ pumps into. On the frount (under the BK) Im gonna mount a water chiller. Does it seem like my plans are in order, or are there any sudgestions on the way my configuration might work better?
thanks
spooky