As if there are not enough eBIAB build threads, here is my take on an electric BIAB brewery. I am going to use a 4500W / 240V heating element in a 42qt aluminum Bayou Classic stock pot. After about a month of gathering parts I was finally able to start assembling everything.
So far I have drilled all the holes into the enclosure and dry fitted all the parts. I hope to start wiring everything up tomorrow and fit the pot in a few days. Thanks to P-J for the wiring diagrams he has provided that inspired the wiring, and Kal for his awesome electric brewery from which I have stolen many ideas. Finally without further ado here are the pics.
Front Panel Layout
Power and RTD Probe Connectors Layout (Bottom of Enclosure)
All the Parts Finally Gathered
The Front of the Panel Drilled
The Bottom of the Panel Drilled
All the Parts Dry Fitted on the Front
The Power Connectors Dry Fitted on the Bottom
Wiring Diagram (Inspired by P-J)
Not Pictured
The SPA GFCI Power
Pot, heating element etc.
So far I have drilled all the holes into the enclosure and dry fitted all the parts. I hope to start wiring everything up tomorrow and fit the pot in a few days. Thanks to P-J for the wiring diagrams he has provided that inspired the wiring, and Kal for his awesome electric brewery from which I have stolen many ideas. Finally without further ado here are the pics.
Front Panel Layout
Power and RTD Probe Connectors Layout (Bottom of Enclosure)
All the Parts Finally Gathered
The Front of the Panel Drilled
The Bottom of the Panel Drilled
All the Parts Dry Fitted on the Front
The Power Connectors Dry Fitted on the Bottom
Wiring Diagram (Inspired by P-J)
Not Pictured
The SPA GFCI Power
Pot, heating element etc.