ahave
Well-Known Member
So I am about to embark on my mash tun RIMS build and thought I might put out a feeler to see if anyone had some extra components to sell before I pull the trigger(s).
Excuse the short-hand nomenclature, this is pretty much a copy/paste from my build list from excel. I am also up for any suggested substitutions if you have them to sell (ie, using all tri-clover fittings instead of mix-and-match) or if you think I am missing anything from my RIMS tube build.
SS Fittings
1.5" Tee (or tri-clover tee)
1.5" X 1/2" NPT HEX
1.5" x1" NPT HEX
1/2" x 6" nipple
1/2" ball valve
1/2" 90deg elbow
1.5" Tri-Clover Fittings
1.5" TC Sight Glass
1.5" TC x 1.5" NPT HEX
1.5" gasket
1.5" clamp
2" Tri-Clover Fittings (to attach to keg drain)
TC Clamp 2"
TC Gasket EPDM 2"
2" Tri-Clamp X 1/2" Male NPT
Element LWD
Electronics
Thermocouple K-Type w/ 1/2" HEX
1/16 DIN PID Temperature Controller
SSR w/ heatsink
Panel mount connector for K thermocouple
I am also in the need of a Keg for Keggle conversion. I plan on cutting the bottom for the top to be a bottom drain, so an already converted keggle would not work for me. I Prefer to deal local for this one, I am also planning on putting out a CL ad in addition.
Excuse the short-hand nomenclature, this is pretty much a copy/paste from my build list from excel. I am also up for any suggested substitutions if you have them to sell (ie, using all tri-clover fittings instead of mix-and-match) or if you think I am missing anything from my RIMS tube build.
SS Fittings
1.5" Tee (or tri-clover tee)
1.5" X 1/2" NPT HEX
1.5" x1" NPT HEX
1/2" x 6" nipple
1/2" ball valve
1/2" 90deg elbow
1.5" Tri-Clover Fittings
1.5" TC Sight Glass
1.5" TC x 1.5" NPT HEX
1.5" gasket
1.5" clamp
2" Tri-Clover Fittings (to attach to keg drain)
TC Clamp 2"
TC Gasket EPDM 2"
2" Tri-Clamp X 1/2" Male NPT
Element LWD
Electronics
Thermocouple K-Type w/ 1/2" HEX
1/16 DIN PID Temperature Controller
SSR w/ heatsink
Panel mount connector for K thermocouple
I am also in the need of a Keg for Keggle conversion. I plan on cutting the bottom for the top to be a bottom drain, so an already converted keggle would not work for me. I Prefer to deal local for this one, I am also planning on putting out a CL ad in addition.