I’ve got a two tier synergy brewing stand with two burners built in. I’m building an electric system in my basement so sorry for the mess. It has the gas line plumbed so you just need one tank to run both burners. It worked great for me. I used the tower of power to control it but you could easily do it manually. I am removing the solenoid valve seen in the picture. Local pickup only around Lebanon, NH. $150 obo.