pointcity-homebrew
Crafting openers 1 at a time
I recently acquired a Kenmore side by side and am going to convert it to a keezer/ferm chamber.
I am going to use 2 Stc-1000s one to control the compressor and the other to control the fan and heat source in the ferm side.
My thoughts are to just wire the thermostat wires, 1 black 120V and 1 orange that passes the 120V to the defrost timer. That way I have the defrost circuit in tact and do not have to worry about that.
I then will have a fan that will pull the cold air from the freezer side into the fridge side.
Does anyone with experience see any issues with this plan?
Thanks for any advice
I am going to use 2 Stc-1000s one to control the compressor and the other to control the fan and heat source in the ferm side.
My thoughts are to just wire the thermostat wires, 1 black 120V and 1 orange that passes the 120V to the defrost timer. That way I have the defrost circuit in tact and do not have to worry about that.
I then will have a fan that will pull the cold air from the freezer side into the fridge side.
Does anyone with experience see any issues with this plan?
Thanks for any advice