swerner
Well-Known Member
I recently aquired some steel framing from a comercial job and decided to build my brewstand. The actual framing is 3" square and the deck and shelving are made of 1 1/2" steel angle. I put everything together with bolts and screws. I am still in the process of building everything but I do have some pictures of my progress thus far. I plan on running gas pipe to feed 2 burners and installing an electric switch to run the March pump. I still need 1 more burner for the HLT. I was able to put on 6 threaded casters for easy rolling out of the garage for nice brew days. I can't wait to get everything up and running.