TsunamiBeer
Well-Known Member
I am building a single tier brew stand with three burners. I am using two 10" banjos and a smaller banjo. I went to a plumbing supply to get gas hoses and connectors and they didn't have the stuff to make it work. I want to be able to use them manually until I can build in the automation.
I was thinking of using 1/2" gas hose from appliance hookups then using 1/2"male thread to 1/2 flare...then a flare female swivel...then the orifice valve. I will use a ball valve to connect supply pipe to gas hose at the supply end.
Thoughts on making the connections?
Thanks!
I was thinking of using 1/2" gas hose from appliance hookups then using 1/2"male thread to 1/2 flare...then a flare female swivel...then the orifice valve. I will use a ball valve to connect supply pipe to gas hose at the supply end.
Thoughts on making the connections?
Thanks!