rebl68
Member
Thanks...it has been a long time in the making. I painted the bar this weekend. My wife and I plan on grouting Tuesday and then drop ceiling over the next few weeks. I have been working on this for waaaaaay too long. Finishing 1800+ sq. ft. of the basement was more than I bargained for, but it's worth it. I just need to get this knocked out, because I have 3 kegs and the materials to start my all grain brewing rig and another 400 sq. ft. of the basement to finish into a brewing room. My wife wants me out of the kitchen on brewing days. Where in Rochester are you from?
I'm at Walton and Adams pretty much....right by OU and the mall there.....