cwheel
Well-Known Member
Hoping to find a home for my electric brewing project - I took it to about 90% complete, and like most of my projects, it stalled there.
Includes a welded 3-tier frame, a controller box with a lot of the PID logic necessary for controlling the elements, plus 240V and 120V wiring, etc. Also comes with two stainless pots with elements already installed, including power.
The tower has some rust and I've had the pots for so long in an unconditioned garage that they have some slight pitting.
But hey, it's free....
Located in Charlottesville, VA
Includes a welded 3-tier frame, a controller box with a lot of the PID logic necessary for controlling the elements, plus 240V and 120V wiring, etc. Also comes with two stainless pots with elements already installed, including power.
The tower has some rust and I've had the pots for so long in an unconditioned garage that they have some slight pitting.
But hey, it's free....
Located in Charlottesville, VA