Used wiring diagrams from the internet for this brew rig! Asked lots of questions and did lot of research! Had to learn 110 and 220v systems first to understand how I would build my electric panel. The wiring of the panel was the most time consuming about 20hrs of labor on my spare time, a lot of that time was setting up everything to start where I left off none the less it sure was a challenge.
Boiling Equipment: E-Herms, 3 100qt stainless pots with 2 5500w heating elements for the Boil and HL
Fermentation Vessels and Equipment:5 gal carboys and temp controled chest freezer
Wort Chillers: 30 plate chiller
Plumbing, Pumps and Hardware: 2 march pump