I am adding a 20 gallon BoilerMaker HLT in a couple weeks, but this is my current brewhouse. Current HLT is my former boil kettle (10 gallon megapot). Using a 70qt Coleman Xtreme as MLT. 30 gallon BoilerMaker is my boil kettle. I was originally planning to get a 20, but LHBS had a 'factory blemished' 30 (I've yet to find the blemish) that with a Facebook trivia discount (15% off any single item) came in cheaper than a 20.
Design:
Base platform:
Boil kettle tier:
HLT/MLT tier:
First tier mounted:
Second tier begins:
Second tier complete:
Mocked up:
Another view:
Checking fit in the area it's going to be stored in:
Added a center shelf for additional stability and function:
Added backboard to mount a few things:
Put a coat of honey gold tinted water sealer:
Bought a roll of flashing just in case:
Flashing on the top tier:
Mounted the Therminator:
Ready for maiden voyage:
From boil to this (with a pre-chiller) instantly:
Took some of the left over flashing and made windscreens:
Mounted the water filter and potable hose reels:
Mounted a paddle/tool rack:
Design:
Base platform:
Boil kettle tier:
HLT/MLT tier:
First tier mounted:
Second tier begins:
Second tier complete:
Mocked up:
Another view:
Checking fit in the area it's going to be stored in:
Added a center shelf for additional stability and function:
Added backboard to mount a few things:
Put a coat of honey gold tinted water sealer:
Bought a roll of flashing just in case:
Flashing on the top tier:
Mounted the Therminator:
Ready for maiden voyage:
From boil to this (with a pre-chiller) instantly:
Took some of the left over flashing and made windscreens:
Mounted the water filter and potable hose reels:
Mounted a paddle/tool rack: