- Joined
- Jul 5, 2008
- Messages
- 177
- Reaction score
- 72
Tried searching, but no go ...
Due to wiring limitations where I need to keep everything, I need to put my 7 cu ft deep freeze (stock), controlled fermentation chamber (wine fridge), and kegerator all on a single 15A circuit.
I started scratching out a relay circuit to give priority to the deep freeze, then the fermenter chamber, then the kegerator, but stumbled on inhibiting the other outlets to prevent two from running at the same time. The real concern would be having two starting up simultaneously, and kicking off the circuit (bad, very bad for the freezer contents ...)
Has anyone already tackled this?
TIA!
Due to wiring limitations where I need to keep everything, I need to put my 7 cu ft deep freeze (stock), controlled fermentation chamber (wine fridge), and kegerator all on a single 15A circuit.
I started scratching out a relay circuit to give priority to the deep freeze, then the fermenter chamber, then the kegerator, but stumbled on inhibiting the other outlets to prevent two from running at the same time. The real concern would be having two starting up simultaneously, and kicking off the circuit (bad, very bad for the freezer contents ...)
Has anyone already tackled this?
TIA!