I haven't brewed in over a year because I have other interests and little time. It's time to say goodbye to my setup.
I was 1/2 way through converting to all electric but didn't quite get there. I would love to sell it all together but will let it all go separately because everything is just collecting dust.
Both keggles are bottom draining. Everything has 1/2" Quick disconnects from brewhardware.
HLT, QDs, screen false bottom- $40
Boil kettle w/5500w element, site glass + thermometer, screen fb, electrical cable, QDs - $100
#SOLD
# Barley crusher - SOLD
# 50' 1/2" Copper chiller w/ QDs - SOLD
# SS Chugger pump w/ QDs - SOLD
# Misc (hoses, weldable heating element enclosure, whatever else I find) - SOLD
#SOLD
All that's left are the keggles.
$120 for the HLT, BK, and all the wiring I have.
I was 1/2 way through converting to all electric but didn't quite get there. I would love to sell it all together but will let it all go separately because everything is just collecting dust.
Both keggles are bottom draining. Everything has 1/2" Quick disconnects from brewhardware.
HLT, QDs, screen false bottom- $40
Boil kettle w/5500w element, site glass + thermometer, screen fb, electrical cable, QDs - $100
#SOLD
# Barley crusher - SOLD
# 50' 1/2" Copper chiller w/ QDs - SOLD
# SS Chugger pump w/ QDs - SOLD
# Misc (hoses, weldable heating element enclosure, whatever else I find) - SOLD
#SOLD
All that's left are the keggles.
$120 for the HLT, BK, and all the wiring I have.