Bock_Lesnar
Active Member
- Joined
- Jul 31, 2012
- Messages
- 29
- Reaction score
- 2
So as the title might suggest, I've just bought two 1/2 barrel kegs and, despite a ton of googling and searching this place, still can't quite decode what I'm going to need to convert these things into a working keggle.
I'll be using the two kegs for a HLT and boil kettle for now, with a 10 gallon Rubbermaid cooler as a mash tun.
My issue isn't so much that there isn't enough information, it's that there's almost too much different information and I can't narrow down exactly what I need to build the tap. Compounding the issue is the fact that we don't have as wide a range or selection down here in New Zealand, so I'm pretty much getting all my stuff from one site - http://www.hoseshop.co.nz/newsite/our-products
So with all this in mind, here are some questions:
1. What from this selection and in terms of seals etc would I need to get to allow me to fit this?
2. From that valve I've just listed, what sort of attachment do I need to step it down so that I can attach tubing to transfer between vessels?
Apologies for the potentially stupid questions, I am just at a loss in terms of what is the best approach to all this, given all of it is completely outside of my wheelhouse, so to speak. Any help massively appreciated.
I'll be using the two kegs for a HLT and boil kettle for now, with a 10 gallon Rubbermaid cooler as a mash tun.
My issue isn't so much that there isn't enough information, it's that there's almost too much different information and I can't narrow down exactly what I need to build the tap. Compounding the issue is the fact that we don't have as wide a range or selection down here in New Zealand, so I'm pretty much getting all my stuff from one site - http://www.hoseshop.co.nz/newsite/our-products
So with all this in mind, here are some questions:
1. What from this selection and in terms of seals etc would I need to get to allow me to fit this?
2. From that valve I've just listed, what sort of attachment do I need to step it down so that I can attach tubing to transfer between vessels?
Apologies for the potentially stupid questions, I am just at a loss in terms of what is the best approach to all this, given all of it is completely outside of my wheelhouse, so to speak. Any help massively appreciated.