Just started my first keezer build. Picked up the Holiday 5.0 at Lowes the other day. I moved into an apartment and had to scrap my original plans for 16 cu ft one, but I can't wait to get this one up and running.
I've been remodeling my place so it's messy and my workroom is my empty bedroom. But it gave me the opportunity to do this before it's all finished. (Couch sleeping for 2 1/2 months is not fun, unless you've had a few beers)
As for this freezer I can fit 4 kegs inside and I will be mounting the CO2 outside. I am planning a 1x10 collar with 1" foam inside. All of the taps and other accessories will have to wait a few weeks until I get back from some much needed R&R.
I figured I start this now and add as I go. I've made the base with 3" swivel casters, the 2 in front have brakes. I will be making it into a cabinet and have the front out 6 inches so there will be a ledge with a drip tray under the taps. And I will have a counter space for glasses on the side above where the CO2 tank will be.
The collar has already been cut and tomorrow it will be stained.
brand new freezer!
4 kegs, 2 on the hump and 2 on the floor
the rolling base... where it all begins
I've been remodeling my place so it's messy and my workroom is my empty bedroom. But it gave me the opportunity to do this before it's all finished. (Couch sleeping for 2 1/2 months is not fun, unless you've had a few beers)
As for this freezer I can fit 4 kegs inside and I will be mounting the CO2 outside. I am planning a 1x10 collar with 1" foam inside. All of the taps and other accessories will have to wait a few weeks until I get back from some much needed R&R.
I figured I start this now and add as I go. I've made the base with 3" swivel casters, the 2 in front have brakes. I will be making it into a cabinet and have the front out 6 inches so there will be a ledge with a drip tray under the taps. And I will have a counter space for glasses on the side above where the CO2 tank will be.
The collar has already been cut and tomorrow it will be stained.
brand new freezer!
4 kegs, 2 on the hump and 2 on the floor
the rolling base... where it all begins