Hey everyone. About to start my electric brewery build. My plan is to do a RIMS system. I'm pretty handy but I can't draw wiring diagrams to save my life. What I want is a three PID, 2 pump system. I want a PID running a 220 element in the HLT, same in the BK. But I want a 110 element in my RIMS tube for my MLT, with a PID controlling that as well. I have no clue how to wire it. Haven't seen exactly that from PJ either. I can read wiring diagrams well, just can't design or draw them. Any help would be great. Thanks!
Sent from my iPhone using Home Brew
Sent from my iPhone using Home Brew