Hi everyone, I have a DIY 100amp BCS panel. I have everything 99% buttoned up, but now ran into a question while doing my trial run. Following their wiring schematic, when I have the panel in BCS control mode, one leg of my elements will have power supplied to it. The second leg will become energized by the BCS. How does this not burn out the elements? A meter shows 120v to ground on L2, and 50v L1-L2.
Ideas?
Ideas?