adhomebrew10
Well-Known Member
I have a Summit under cabinet kegerator which I would like to drill so I can move the C02 external. I was thinking the top would be the best place, maybe near the hole drilled for the draft tower. I cannot find any drawings from Summit that say whether any lines run through the top, however. Does anyone have any experience or done something similar?