-MG-
Well-Known Member
I'm currently building out my basement that will have a 4 faucet tower on the bar counter with a chest freezer from behind the wall feeding it. Lines will be glycol chilled.
I'm looking at a tower that has stainless steel lines in it, guessing about 5 feet, and I like the concept of ss lines instead of vinyl. I'm told the resistance is 1.2lbs per foot for ss. I would connect this to 3/16 vinyl for the line going into the chest freezer. My question is how do I figure how long of line I will need past the tower. I'd like ss but if it's too complicated I'll just do s 3/16 vinyl line all around.
Thoughts?
I'm looking at a tower that has stainless steel lines in it, guessing about 5 feet, and I like the concept of ss lines instead of vinyl. I'm told the resistance is 1.2lbs per foot for ss. I would connect this to 3/16 vinyl for the line going into the chest freezer. My question is how do I figure how long of line I will need past the tower. I'd like ss but if it's too complicated I'll just do s 3/16 vinyl line all around.
Thoughts?