mikescooling
Well-Known Member
Hey guys, I'm moving and never got around to welding my second brew stand. I have all the 16 gauge mild steel tubing 2X2 cut to size. The ends of the top are cut on 45* so they mate up nice. All the cuts were done by ROCO steel and I gave them JohnW cut list and diagram. They did a great job, all the joints are tight and easy to weld. I paid 108$ OTD, I only asking for 75$ because I want a fast sale. Their is another bag of cross pieces like the ones on the right, 6 in total, but 4 are not shown in the picture. Cash is king
I'm in Wilmette IL, AKA north side of Chicago.
http://i1296.photobucket.com/albums/ag11/mikescooling/IMG_20140401_120306_161_zpsc0278b02.jpg
I'm in Wilmette IL, AKA north side of Chicago.
http://i1296.photobucket.com/albums/ag11/mikescooling/IMG_20140401_120306_161_zpsc0278b02.jpg