Rondacker
Well-Known Member
I am finally starting my E-brewery build: I'm making the boil keggle, and want to install a bottom dump valve. My question is; silver solder a threaded insert to the keg's top opening, flip over and remove the "bottom", or remove the top, as I did for my HLT, and silver solder to the bottom. Additionally, how would I install a pick up tube with the bottom dump?
Thanks in advance for any input.
Steve
Thanks in advance for any input.
Steve