mpcondo
Well-Known Member
- Joined
- Apr 28, 2009
- Messages
- 99
- Reaction score
- 3
I am wanting to downsize my equipment. This is a 1/2 bbl 3 tier system with sparge arm.
-3 x 26-gallon kettles with ball valve
-3 x Burners with natural gas and propane hoses
-1 Ultimate Sparge Arm
-silicone tubing
The mash ton has a stainless steel braid and thermometer. The brew kettle has a sight glass installed. This system is just too big for me at the moment, I actually had this setup by someone from a local brewery to make sure I had everything that I needed because it was intended to be a small pilot system. I will get everything set up this weekend for photos, and to update this thread with any extras that I forgot.
All are in very good condition, only a few batches brewed on this system. I have invested over $1500 in this system and asking $850.
-3 x 26-gallon kettles with ball valve
-3 x Burners with natural gas and propane hoses
-1 Ultimate Sparge Arm
-silicone tubing
The mash ton has a stainless steel braid and thermometer. The brew kettle has a sight glass installed. This system is just too big for me at the moment, I actually had this setup by someone from a local brewery to make sure I had everything that I needed because it was intended to be a small pilot system. I will get everything set up this weekend for photos, and to update this thread with any extras that I forgot.
All are in very good condition, only a few batches brewed on this system. I have invested over $1500 in this system and asking $850.