Finally made some additional progress! I created the movable base the keezer sits on:
And made the collar:
And decided to insulate the collar:
I attached the collar to the lid with caulk and out the original rubberized stripping on the bottom of the collar (thanks TomSD for the...
I am planning on attaching the collar to the lid to minimize the amount I have to lift the kegs (I'm short, so this has proven to be difficult, hahaha). I want to collar to be as tall as possible while still putting base with wheels on the bottom and still fit in the space I have for it (which...
The beer fairy arrived (FedEx) with the rest of my parts!
2 of these set ups for my taps:
1 3-way CO2 distro and 2 gas connections:
If all goes well, I will be adding another 2 or 3 valve distro for the other pressure and the accompanying taps. Baby steps here...
I got 1/4" beer...
Going to put in 2 to start to make sure that I have all my parts correct and everything running smoothly. I plan to expand to 4-6 depending on how many kegs I can fit in there.
The cost has been a little crazy since I am starting from scratch, but I am at round $600 for everything, which...
Will do, BigRigg.
Tom - I used your thread as inspiration to take the plunge - appreciate the write up. I am going to use your method of taking off the original seal and putting it on the bottom of the collar. I'll let you know how it goes. Also probably going to rip your chalkboard paint...
I just received delivery of my new GE 7.0 cf freezer from HD this morning and am pretty stoked on getting my build started. Most of the other parts have been ordered and I will update this thread when everything starts coming in.
I have been lurking on the forum for a long time and finally...
Was searching around and stumbled on this thread - what a cool idea. I will be implementing some of these ideas into my garage re-build this winter. Thank you!