Have you built those dead spaces into your equipment profile in beer smith? I have dead space from my rims tube and intentional dead space in my kettle. Both if these are reflected in my equipment profile. The mash tun dead space input on the mash profile page is what i use to compensate for my...
Thanks for all the info from everyone who has posted. I have one question though. What gauge wire is recommended for inside the control box between the ssr and pid etc. thanks again.
Hey guys I got my hands on my (fort worth)
city water report. I was wondering how this looks to a more experienced brewer. Any thoughts on styles of beer conducive to water like this? Should I look into RO and build my water? Should I filter? I don't have a filter yet but I can dilute with...
Ok I have a scale and a truck and am willing to drive wherever to the freight drop off location. I can manage the list if needed. What was used for the freight location last buy?
I'm a cheap ass so I'd probably stick with my step bit when I do my third keg. The holes became slower to cut when I got closer to the final size I needed for some reason. I'd say the first coupling took about an hour an a half while I was figuring it out as I went and being extra careful. Once...
FAFRD,
Thanks for the response. I did use full couplings. The longest part of the process was drilling a hole. I used a self tapping step bit I got from amazon. The dimpling tool was the recommended tapered 3/4-1/2" coupling with the larger coupling. I did have to use a half inch bolt and a...
I just wanted to thank everyone who posted to this thread. I learned a lot an was able to pull a dimple and solder two couplings yesterday. Great info for someone who has never done work like this before. Cheers.🍻