10 years in the making.
Blichmann boilermakers= 20 gal. HLT, 20 gal. Mash, 30 gal boil Kettle
Custom built brew stand with dump for mash and boil kettle. Two attached pumps with switch. And lock-in castors to portability in the brew room
Custom built Electrobrew 2000. 240Vac with 15 foot GFCI...
I’m so close to pulling the trigger on going all electric. How much more is needed to get the panel up and running? Not including the heating elements. And do you have an estimated cost for shipping to South Carolina?