tel72
Member
- Joined
- Mar 25, 2013
- Messages
- 14
- Reaction score
- 0
So after looking around and making my first batch of beer I decided I wanted to go to all grain set up.mostly because I enjoy building and fabricating stuff The problem is I don't have a lot of extra cash to do it all at once so I decided to start collecting parts I would need I have been looking for kegs for couple weeks with no luck everyone I found was 50$ or more then today I was in the right place at right time and scored 3 kegs 2 have tops already cut out 1 has nipple welded in for drain valve already all free. Not sure if I will use one for mash tun or not but have one just in case now I need burners and tubing