My all-electric basement brewery:
Entry way, kegerators (4 taps) and storage
Work area, mill, sink
Brewing rig, electric control panel
Brewing rig, electric control panel
Fermentation area
Motorized mill
Vapor hood with fan
Mill wall, kegs, storage
Does anyone have experience using a heating element after a scorching incident? Can the element be cleaned to the point where it can continue service?
I now have a fix to controlling power that caused the scorching in the first place.
I have an erector set-style stand that was made by Harpo. It is really nice, shippable, and can be set up in 1 or 2 level configuration.
He has one that has burner mounting, or flat tiers for electric (like mine).
He might be able to help you figure out something that would work.